Power Outages: Status: Contact: Start Time: End Time:
ARC Building Power Outage to Support Replacement of Lab Air Conditioning System Confirmed Carroll W. Jones 08/30/2016 05:00 08/30/2016 12:00
Test Lab Emergency Loop Testing Completed j. willoughby 08/26/2016 14:00 08/26/2016 15:00
Portion of east Test Lab lot to be closed Confirmed ed winslow 08/24/2016 07:00 08/25/2016 18:00
SSC Lighting Completed j. willoughby 08/24/2016 07:00 08/24/2016 07:30
Road Closures: Status: Contact: Start Time: End Time:
Concrete slab on south east corner outside Test Lab Addition Confirmed Suresh Chandra 08/22/2016 08:00 08/26/2016 17:00
Partial Lane barricade on Hadron Drive from the Accelerator, N. Bound Confirmed Maynard Brown 08/18/2016 09:00 08/18/2016 14:00
HVAC Outages: Status: Contact: Start Time: End Time:
ARC Laboratory Switchover from Temp. Cooling Unit to Permanent Air Handling Unit Proposed Carroll W. Jones 09/02/2016 07:00 09/02/2016 17:00
Startup of Test Lab Chiller Plant and Testing of Combined Central Chiller Plant Confirmed Carroll W. Jones 08/26/2016 08:00 09/09/2016 17:00
Install Test Lab Cooling Tower Bypass Valve Actuator Modification Completed Carroll W. Jones 08/24/2016 08:00 08/24/2016 11:00
General Outages: Status: Contact: Start Time: End Time:
B28 SSC Soffit/Roof Work Parking Outage Proposed Renzo 07/12/2016 14:03 08/29/2016 14:03
Options: