Power Outages: Status: Contact: Start Time: End Time:
EEL MP1 Confirmed J. Willoughby 04/11/2014 07:00 04/11/2014 09:00
Road Closures: Status: Contact: Start Time: End Time:
Modification to Sprinkler Pipe Confirmed Suresh Chandra 03/31/2014 09:45 04/11/2014 05:00
HVAC Outages: Status: Contact: Start Time: End Time:
Test Lab Boiler System Hot Water Flow Balancing Confirmed Carroll W. Jones 04/22/2014 07:30 05/01/2014 17:00
Install Pressure Taps in Test Lab Process Cooling Water System Completed Carroll W. Jones 04/11/2014 15:00 04/11/2014 17:00
Install Pressure Taps in TED Geothermal Water System Across Pumps and DP Sensors Completed Carroll W. Jones 04/11/2014 11:00 04/11/2014 15:00
Install Pressure Taps in Test Lab Hot Water System Across Pumps and DP Sensors Completed Carroll W. Jones 04/11/2014 08:00 04/11/2014 11:00
ARC Lab Phoenix Ventilation Control Audit (Update) Completed Carroll W. Jones 03/26/2014 08:00 04/18/2014 17:00
Options: