LN1 Transformer replacement Proposed Josh Caterbone 06/04/2015 08:00 06/04/2015 16:00
Test Lab FEL-L1 Confirmed J. Willoughby 05/18/2015 07:00 05/18/2015 08:00
Test Lab Outage Confirmed J. Willoughby 05/16/2015 07:00 05/16/2015 15:00
provide power to newley installed receptacles Completed Josh Caterbone 04/29/2015 06:00 04/29/2015 07:00
Receptacle hook up for control racks Completed Josh Caterbone 04/28/2015 06:00 04/28/2015 07:00
UIM Electrical - CHL Loop Upgrade Confirmed Michele Solaroli 04/20/2015 07:00 05/22/2015 17:00
CMSA Power Outage Confirmed Paul Powers 04/08/2015 07:00 04/08/2015 12:00
Power outage for outside golf carts Completed Josh Caterbone 04/08/2015 05:00 04/08/2015 06:00
VTA Power Outage Completed J. Willoughby 04/06/2015 07:00 04/06/2015 08:00
UIM Electrical Distribution - North Loop Completed MIchele Solaroli 04/01/2015 08:00 04/02/2015 17:00
Bldg. #97, 2nd Fl - Electrical Breaker Replacement Completed Maynard Brown, III 03/30/2015 07:00 03/30/2015 08:00
Install proper size ground wire for outlets Completed Josh Caterbone 03/20/2015 05:00 03/20/2015 07:00
3rd floor power outage for the ARC Completed Josh Caterbone 03/07/2015 07:00 03/07/2015 12:00
Road Closures: Status: Contact: Start Time: End Time:
RadCon ditch cleanout Completed winslow 04/14/2015 07:00 04/17/2015 17:00
Concrete Walkway Slabs Replacement at VARC & ARC Confirmed Suresh Chandra 03/12/2015 08:00 03/16/2015 17:00
HVAC Outages: Status: Contact: Start Time: End Time:
Bldg. 12 C-Wing HVAC Repairs Confirmed Mike Sprouse 05/17/2015 07:00 05/17/2015 19:00
Switchover to CUP Chiller Completed Carroll W. Jones/Mike Sprouse 05/15/2015 11:00 05/14/2015 12:00
Bldg 12 C-Wing HVAC Fan Balancing Completed Mike Sprouse 05/06/2015 08:45 05/06/2015 12:00
ARC GovernAir Failure Completed Mike Sprouse 04/16/2015 09:55 04/16/2015 13:00
Water Outages: Status: Contact: Start Time: End Time:
TED Domestic Water Leak Repair Completed Mike Sprouse 04/01/2015 20:00 04/01/2015 21:00