Scheduled Outage:

Title: B90 Loading Dock Drainage and Pavement
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: T. Renzo E-Mail: renzo@jlab.org
Start Time: 04/21/2017 08:00 End Time: 06/02/2017 05:00
Description and Impacts: Trench drain and connection to storm drain system will be installed at B90 Shipping and Receiving Loading Dock. Approximately 20 parking spaces will be blocked off during construction.

Affected Areas:

EEL Parking