Scheduled Outage:

Title: Partial Lane barricade on Hadron Drive from the Accelerator, N. Bound
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: Maynard Brown E-Mail: maynard@jlab.org
Start Time: 08/18/2016 09:00 End Time: 08/18/2016 14:00
Description and Impacts: Contractor will be excavating the sidewalk adjacent to construction site to the existing 12" water main and tapping 6" line to feed the new ESHQ Building. Flaggers will be on site to control the traffic flow.

Affected Areas:

Hadron Drive