| Scheduled Outage: | |||
| Title: | Shutdown B02 S. Linac (5-year PMs) Affected Bldgs. B56, B82, B08A, B68, & B70 | ||
| Type: | Power Network Telephone Road HVAC Water Gas Controls Other | ||
| Status: | Proposed Confirmed Cancelled Completed | ||
| Proposed by: | Howard Dunlap | E-Mail: | dunlap@jlab.org |
| Start Time: | 09/22/2026 06:30 | End Time: | 09/24/2026 15:00 |
| Description and Impacts: | FMO-E will be performing required 5-year extensive preventive maintenance on all switchboards, panels and disconnects, excluding emergency power. This outage will take place over three days, with work scheduled for 8 hours each day. On September 22, 2026, we will perform the 5-year intensive preventive maintenance on all panels and disconnects associated with SB-SL1 and SB-SL2. On September 23, 2026, we will perform the 5-year preventive maintenance on all panels and disconnects associated with SB-SL3 and SB-SL4. On September 24, 2026, we will complete the 5-year preventive maintenance on the panels and disconnects for Buildings 56, 68, 82, and 70, which are fed by SB-SL1 and Breaker 5 in SB-SL4. Please reference ATlis-121131, as some affected buildings will experience multiple power interruptions throughout the week. | ||
| Affected Areas: | |||
Bldg 02: South LINAC Bldg 04: Exit Stair No. 4 Bldg 08: Central Helium Liquefier Bldg 56: West Arc Service Bldg 68: West Arc Service Bldg 70: Exit Stair No. 5 Bldg 82: South Extractor Service |
|||