Scheduled Outage:

Title: End Station Area (Halls A,B,C) Emergency Power Outage for Elec PM
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: Paul Powers E-Mail: powersp@jlab.org
Start Time: 08/22/2024 07:15 End Time: 08/22/2024 08:00
Description and Impacts: Multiple, Very brief power outages in the Emergency system while power is cycled in the various circuit breakers.

Affected Areas:

Bldg 91: Beam Dump Cooling Building A
Bldg 92: Service Building
Bldg 94: Experimental Hall B
Bldg 95: Beam Dump Cooling Building C
Bldg 96: Experimental Hall C
Bldg 97: Counting House
Bldg 98: Physics Fabrication Building
Bldg 99: Switchyard Exit Stair
Bldg 101: Experimental Hall A
Bldg 102: End Station Refrigeration


Options: