Scheduled Outage:

Title: Hall D UPS Panel
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: J. WIlloughby E-Mail: jasonw@jlab.org
Start Time: 08/30/2024 07:00 End Time: 08/30/2024 14:00
Description and Impacts: Remove power from 203-PNLB-UPS1

This is the UPS power down in the hall itself. All BLUE outlets will have power removed. Move loads to a non-blue receptacle before the outage.

REC. U2-7, 8
REC. RACK D2, 3-4
REC. TOP DECK
REC. SCR-1
REC. SCR-2
REC. US1-1, U1-13
REC. U1-8
REC. US1-2
REC. N1-3,6 / S1-1,3
CAMERA BY TRUCK RAMP


Affected Areas:

Bldg 203: Experimental Hall D


Options: