Scheduled Outage: | |||
Title: | Hall D UPS Panel | ||
Type: | Power Network Telephone Road HVAC Water Gas Controls Other | ||
Status: | Proposed Confirmed Cancelled Completed | ||
Proposed by: | J. WIlloughby | E-Mail: | jasonw@jlab.org |
Start Time: | 08/30/2024 07:00 | End Time: | 08/30/2024 14:00 |
Description and Impacts: | Remove power from 203-PNLB-UPS1 This is the UPS power down in the hall itself. All BLUE outlets will have power removed. Move loads to a non-blue receptacle before the outage. REC. U2-7, 8 REC. RACK D2, 3-4 REC. TOP DECK REC. SCR-1 REC. SCR-2 REC. US1-1, U1-13 REC. U1-8 REC. US1-2 REC. N1-3,6 / S1-1,3 CAMERA BY TRUCK RAMP |
Affected Areas: | |||
Bldg 203: Experimental Hall D |
|||