| | | |
Scheduled Outage: |
|
Title: |
B12 CEBAF Shutdown Panel RP-111 |
Type: |
Power Network Telephone Road HVAC Water Gas Controls Other |
Status: |
Proposed Confirmed Cancelled Completed |
Proposed by: |
Howard Dunlap |
E-Mail: |
dunlap@jlab.org |
Start Time: |
02/06/2025 06:30 |
End Time: |
02/06/2025 08:30 |
Description and Impacts: |
Shutdown Panel RP-111 to terminate new dedicated circuits for Rm. B100A network switch. A & B wing receptacles (1st floor) will be affected. Rm B100A network rack (networking/data for 1st & 2nd floors A & B wings) will be affected. |