Scheduled Outage:

Title: B58 CMTF Shutdown panel AP-LAB-18 to install outlets needed.
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: Howard Dunlap E-Mail: dunlap@jlab.org
Start Time: 02/05/2025 09:00 End Time: 02/05/2025 11:00
Description and Impacts: Shutdown panel AP-LAB-18 to convert existing 110Vac outlets into 208Vac-3P outlet at 2.45GHz magnetron test stand. (Maximo WO # 75843). Entire panel AP-LAB-18 will be affected. RADCON MONITOR, KLYSTRON 5-WIRE REC., CMTF EXHAUST FAN will be affected. See panel schedule in attachments (ATLIS-115495) for exact affected.



Affected Areas:

Bldg 58: Test Lab