Scheduled Outage:

Title: Testing of ATS in F-Wing
Type: Power Network Telephone Road HVAC Water Gas Controls Other
Status: Proposed Confirmed Cancelled Completed
Proposed by: todd kujawa E-Mail: kujawa@jlab.org
Start Time: 09/12/2025 06:30 End Time: 09/12/2025 07:30
Description and Impacts: Panels EPP, ERPA, EL, & ERPB will see a short loss of power while the normal feed to the ATS is powered off and the time it takes for the generator to start and the emergency feed in the ATS switches over.
This is a functional test of the ATS to verify its operation.
Plan is to do this early before building occupants arrive onsite.
Elevator will be out of service during the test.

Affected Areas:

Bldg 12: CEBAF Center


Options: