Scheduled Outage: |
|
Title: |
B96 SHUTDOWN PANEL C-UPL5 |
Type: |
Power Network Telephone Road HVAC Water Gas Controls Other |
Status: |
Proposed Confirmed Cancelled Completed |
Proposed by: |
Howard Dunlap |
E-Mail: |
dunlap@jlab.org |
Start Time: |
10/09/2024 09:30 |
End Time: |
10/09/2024 11:30 |
Description and Impacts: |
Outlets need to be added. Will require a shutdown of panel C/UPL5. HELIUM VAC. PUMP, AVITRON PUMP, REFIDGERATOR CIRCULATOR, SCAT CHAMB. BLOWER MOTOR will be affected. See panel schedule for all the affected. |