Computer Center Expansion Images

During the summer of this year, 2001, the Computer Center began a series of major changes to prepare for the installation of a second tape silo. The changes included moving Computer Center staff, removing office space (walls) in the Computer Center, and moving most of the computers from the original computer room into the newly expanded area. The pictures below document the changes during different phases of the project. Click on a picture for a larger view.

1
  images/thm_P0001668.gif  
 
The Computer Center door to the offices before the expansion.
2
  images/thm_P0001669.gif  
 
The Computer Center office hallway before the expansion.
3
  images/thm_P0001670.gif  
 
Room L212 in the Computer Center before the expansion.
4
  images/thm_P0001672.gif  
 
Room L212 in the Computer Center before the expansion.
5
  images/thm_P0001673.gif  
 
Room L212 in the Computer Center before the expansion.
6
  images/thm_P0001674.gif  
 
The Computer Center office space during the expansion.
7
  images/thm_P0001675.gif  
 
The Computer Center office hallway during the expansion.
8
  images/thm_P0001680.gif  
 
The newly expanded Computer Center.
9
  images/thm_P0001681.gif  
 
The newly expanded Computer Center.
10
  images/thm_P0001682.gif  
 
Installing the first rows of computer racks.
11
  images/thm_P0001683.gif  
 
The newly installed computer racks with some systems.
12
  images/thm_P0001684.gif  
 
Installing the second row of computer racks.
13
  images/thm_P0001685.gif  
 
Room L212 after moving out some of the computer racks.
14
  images/thm_P0001687.gif  
 
Room L212 after moving out more of the computer racks.
15
  images/thm_P0001688.gif  
 
The newly expanded Computer Center.
16
  images/thm_P0001689.gif  
 
Installing the computer racks in the expanded Computer Center.
17
  images/thm_P0001690.gif  
 
Farm nodes waiting to be installed in their racks.
18
  images/thm_P0001691.gif  
 
Database servers and farm nodes waiting to be installed.
19
  images/thm_P0001692.gif  
 
Database servers and farm nodes waiting to be installed.
20
  images/thm_P0001693.gif  
 
Room L212 after moving out the computer racks.
21
  images/thm_P0001694.gif  
 
Rewiring the remaining racks in room L212.
22
  images/thm_P0001695.gif  
 
Room L212 after moving out the computer racks.
23
  images/thm_P0001696.gif  
 
Room L212 after moving out the computer racks.
24
  images/thm_P0001697.gif  
 
Room L212 after moving out the computer racks.
25
  images/thm_P0001698.gif  
 
The computer racks in the newly expanded Computer Center.
26
  images/thm_P0001699.gif  
 
The newly expanded Computer Center.
27
  images/thm_P0001700.gif  
 
The newly expanded Computer Center.
28
  images/thm_P0001701.gif  
 
Room L212, ready for the second tape silo.
29
  images/thm_P0001702.gif  
 
Room L212, ready for the second tape silo.
30
  images/thm_P0001703.gif  
 
Room L212, ready for the second tape silo.
31
  images/thm_P0001704.gif  
 
Room L212, ready for the second tape silo.
32
  images/thm_P0001705.gif  
 
Room L212, ready for the second tape silo.
33
  images/thm_P0001706.gif  
 
Installing the pass through wall on the original tape silo.
34
  images/thm_P0001707.gif  
 
Installing the pass through wall on the original tape silo.
35
  images/thm_P0001709.gif  
 
Installing the floor of the new tape silo.
36
  images/thm_P0001710.gif  
 
Installing the floor of the new tape silo.
37
  images/thm_P0001711.gif  
 
The completed floor of the new tape siloP0001711.JPG
38
  images/thm_P0001713.gif  
 
Installing the walls of the new tape silo.
39
  images/thm_P0001714.gif  
 
Installing the walls of the new tape silo.
40
  images/thm_P0001715.gif  
 
Installing the walls of the new tape silo.
41
  images/thm_P0001716.gif  
 
The robot's pedestal and motor in the new tape silo.
42
  images/thm_P0001717.gif  
 
The robot's pedestal and motor in the new tape silo.
43
  images/thm_P0001718.gif  
 
Lining up the walls of the new tape silo.
44
  images/thm_P0001719.gif  
 
Lining up the walls of the new tape silo.
45
  images/thm_P0001720.gif  
 
The robot's motor in the new tape silo.
46
  images/thm_P0001721.gif  
 
Looking into the new tape silo during installation.
47
  images/thm_P0001722.gif  
 
Room L212 with the new tape silo partially installed.
48
  images/thm_P0001723.gif  
 
The robot's arm in the new tape silo.
49
  images/thm_P0001724.gif  
 
Installing the robot in the new tape silo.
50
  images/thm_P0001725.gif  
 
Installing the tape shelves in the new tape silo.
51
  images/thm_P0001726.gif  
 
Installing one of the robot's arm in the new tape silo.
52
  images/thm_P0001727.gif  
 
Installing one of the robot's arm in the new tape silo.
53
  images/thm_P0001728.gif  
 
Waiting for the last few parts of the robot.
54
  images/thm_P0001729.gif  
 
Installing the wiring for power to the robot.
55
  images/thm_P0001730.gif  
 
Installing the pass through port between the two tape silos.
56
  images/thm_P0001731.gif  
 
The pass through port between the two tape silos.